Commercial Pilot Project

40.85%

Increased production

10.6%

Average increase over eight-month period
  • Two manual cleanings were performed during the PILOT in which the owner spent thousands of dollars. The panels were dirty again in a matter of weeks.
  • RST improved production by over 10.6% on average over the eight-month period despite 9 rain days in March/April and the two cleanings.
  • Soiling rates steadily increased through the season. In the last two weeks of October, soiling rates increased to over 1%/day.